Details

    • Type: Bug
    • Status: Resolved
    • Priority: Trivial
    • Resolution: Fixed and reviewed
    • Affects versions: 5.0
    • Fix versions: 5.0
    • Components: Configuration
    • Labels:
      None
    • Severity:
      Usability Issue
    • Steps to reproduce:
      Hide
      Steps to reproduce:
      1.
      2.
      3.
       
       Actual Results: The fast workflow has the ID "fast" while the ID of the schedule-and-upload-workflow contains the prefix "ng-"
       
       
       Expected Results: IDs of workflows should be consistent, "ng-" prrefix is no longer needed.
       
       
       Workaround (if any):
       





      Show
      Steps to reproduce: 1. 2. 3.    Actual Results: The fast workflow has the ID "fast" while the ID of the schedule-and-upload-workflow contains the prefix "ng-"      Expected Results: IDs of workflows should be consistent, "ng-" prrefix is no longer needed.      Workaround (if any):  

      TestRail: Results

        Attachments

          Activity

            People

            • Assignee:
              kihler Katrin Ihler
              Reporter:
              kihler Katrin Ihler
            • Watchers:
              1 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved:

                TestRail: Cases